The Bend 6 Hour

543 Dukes Highway, Tailem Bend, SA 5260
Getting There
From Adelaide GPO 105km (1hr 18min)
From Ballarat 513km (5hr 41min)
Date
Race Day: Saturday 12 June 2027
Race Duration
6 Hours
The circuit goes green from 9:30am and the checquered flag sees the conclusion of racing at 3:30pm.
Circuit
TBA
Scrutineering
Friday 11 June 2027, 1:00pm – 5:00pm approx
The Venue
The Shell V Power Motorsport Park (also known as The Bend Motorsport Park) is an international award winning, state of the art, world-class motorsport facility, offering major spectator events, adrenaline filled experiences, unique accommodation and now, Pedal Prix Racing!
Serviced by a central Welcome Centre featuring an auto gallery of unique cars and motorbikes, visitors can enjoy a meal at Apex Bar and Dining overlooking Pit Lane, and stay on the track in the 100-room Rydges Pit Lane Hotel. A BIG4 Holiday Park also caters for holiday makers with camping, caravan, cabin and dormitory accommodation options.
The main racing circuit design has been inspired by some of the world’s most iconic circuits with a combination of technical corners and fast and flowing sections to ensure good racing. The circuit is Australia’s only track to comply with the latest FIA Grade 2 and FIM Category A standards.
There are up to 7 circuit configurations ranging from 2.8 to 7.77 kilometres in length, with the GT Circuit being the second longest permanent circuit in the world, after the Nurburgring (Nordschleife) in Germany.
Shell V Power Motorsport Park was awarded the 2019 International Motorsport Facility of the Year.

